Specifications

Chapter 3 Installing ReadyBox Options
ReadyBox Users Guide 19
LAN Port
Lip
I/O Panel
R
e
a
d
y
B
o
a
r
d
1
0
A
n
g
l
e
°
ReadyBox Side View
L
A
N
1
1
0
°
A
n
g
l
e
Insert ReadyBoard into enclosure just above standoffs.
RdyBox_14a
Figure 3-4. ReadyBoard Positioned Under LAN Ports
Use 0.8”/20mm Standoffs (4)
for first PC/104 Board.
Use 3M P0.5, 6mm screws
with all standoffs.
3M P0.5 Screws (4)
6mm Tread Length
3M P0.5 Screws (4)
6mm Tread Length
ReadyBoard 700
0.8”/20mm Standoffs (4)
(3M P0.5 Thread)
Use screws (4) with washers if not adding
any PC/104 modules to ReadyBoard.
Notes:
Notes: The screws shown
here to secure the
and any of its PC/104 modules to the
ReadyBox chassis are
ReadyBoard
3M P0.5 thread
size and 6mm thread length.
All standoffs have a thread size of
3M P0.5 and accept 3M P0.5 screws.
R
d
y
B
o
x
_
0
8
a
Figure 3-5. ReadyBoard Over Chassis Standoffs