Manual

Other Installation Notes
1. Division 15 to connect gas stubs on oor pedestal to building medical gas supply lines previously
roughed in.
2. Division 16 to feed exible electrical conduits through bottom of oor pedestals into ground for
connection to normal, emergency and low voltage sources provided in ground by division 16 contractor.
www.amico.com 7