Service manual
EBS - MARK II
1-14
Released:01/2013
E-mail: service@amfreece.cz; webside: amfreece.com
Phone: +420 582 309 146; Fax: +420 582 360 606
B - MACHINE INSTALLATION
6. CONNECTING THE MACHINE TO THE DISTRIBUTION OF ELECTRICITY
AND AIR
6.1. The socket of the safety coupler ensures the easy connection of the air modification UHT.
On a regular basis we recommend to use the socket 25 KE AK 13. (order no. FESTO 151
776 designation KD -1/4, order no. RECTUS 38044). The unit has a matching input
. The input pressure must be higher by at least 1 bar (0,1Mpa) than the output pressure
adjusted on the controller . Alternatively, it is possible to use a different connection of
air inlet. In this case the manufacturer recommends to complement the air connection
with manual closure so as is possible to stop the air supply.
6.2. After connecting the air check the set pressure on the controller . It must be min. 0,55
MPa. The correction can be carried out by pushing out the closure . Increase the set
pressure by turning clockwise, decrease it by turning anticlockwise. Push the closure
in again.
6.3. The electric power supply needs to be of 230V. The electricity distribution socket for the
supply fork must meet the requirements of the norm IEC 364-4-41, it must have a 10A
„C“ fuse according to EN 60947-2 (event. 16A „B“ fuse). No other appliances can be con-
nected to the circuit of the fused socket.
NOTE!
The machine is fitted with a filter for the reason of interference elimination according to
EMC - ÈSN EN 50081-1 and 50081-2. In case there is a current protector connected to
the supply network you must use the type designed for devices with stray current and with
high resistance to surge current in the operating wire (e.g. type „S“).
6.4. The provided warranty does not cover the LED diodes of the machine´s sewing light.