Service manual

1-11
Released:01/2013
E-mail: service@amfreece.cz; webside: amfreece.com
Phone: +420 582 309 146; Fax: +420 582 360 606
B - MACHINE INSTALLATION
EBS - MARK II
1. PACKAGE CONTENT
The package includes the following, if not stated otherwise in the
order:
- the composite machine on a base with electric installation
- a cardboard with accessories
(specified in the part about spare parts 3-56)
- a thread stand - see spare parts 3-48
- parts and service manual
CAUTION!
The visible damages of the package must be immediately reported to the carrier. Check
the content of the package with the order and immediately report the possible defects to
the manufactuter - later complaints will not be accepted!
2. UNPACKING AND POSITIONING THE MACHINE
2.1. When unpacking the machine, it is necessary to follow the signs on the package.
2.2. After unpacking the machine, install it into the designated place. The machine is delivered
with the table adjusted for working in a sitting position. The recommended height of the
lower-level desk from the floor is 870 mm. For changing the height or the machine loose
the screw and use the hand crank from the accessories. If you need to raise the
desk, turn it anticlockwise. Tighten well the screw afterwards!
2.3. The supports are used to en-
sure the stability during sewing.
Loose their nut, screw them down
to the floor. Tighten the nut again.
2.4. Before moving the machine to an-
other place raise the supports
after loosening their nuts so as
the stand leans against the mov-
able wheels and the supports
do not hamper in movements.