User manual

4.5 Cleaning the conductivity flow cell in-place
Remove the pH electrode and install the dummy electrode in the pH
flow cell.
Pump a cleaning or sanitising agent through the flow cell. The
standard recommendation is to pump 1 M NaOH for 30 minutes
and then wash out with buffer.
4.6 Cleaning the conductivity flow cell off-line
If the conductivity measurements are not comparable to previous
results, the electrodes in the flow cell may be contaminated and
require cleaning. To clean the flow cell:
1 Pump 15 ml of 1 M NaOH at 1 ml/min through the flow cell
either by using a pump or a syringe.
2 Leave it for 15 minutes.
3 Rinse thoroughly with 50 ml distilled water.
Note: If the flow cell is totally blocked, the blockage can be removed
using a needle or a wire with a diameter less than 0.8 mm.
4.7 Changing the conductivity flow cell
The conductivity flow cell can be changed when required. Make sure
the monitor is switched off before disconnecting/connecting the cell
from the rear of the monitor housing.
If the cell is replaced with a new flow cell, the monitor must be
calibrated with the new cell constant value written on the flow cell
package. See section B.2 in Reference information. If the cell
constant is not known, it can be determined (see also section B.2 in
Reference information).
WARNING! NaOH is injurious to health. Avoid spillage.
WARNING! NaOH is injurious to health. Avoid spillage.
Monitor UPC-900
User Manual 18-1125-55 Edition AE
24
4 Maintenance