SDS
Load
End
Voltage
Unit
3.9Ω 0.9 min
5.1Ω 0.9 min
5.1Ω 0.8 min
10Ω 0.9 hrs
20Ω 0.9 hrs
24Ω 1.0 hrs
75Ω 0.9 hrs
100mA 0.9 hrs
600mA 0.9 cycle
4/F, Hongwan Commercial Building, 4235# Bao'an
District,518126, Shenzhen
Tel:086-0755-29957377
http://www.allkeybattery.com
JunPing Liu
Lihui Chen
HangJun Wu
10s/m 1h/d
260
320
Delayed discharge performance: 93% of M.A.D after 12 months, 85% of M.A.D after 24 months.
Manager
Check
Approval
4h/d
70
75
1h/d
9.2
9.8
24h/d
18
19
15s/m 8h/d
19
20
1h/d
245
270
1h/d
7.8
8.7
24h/d
135
145
4m/h 8h/d
220
240
Minimum 1.50 volts, Maximum 1.68volts
6.2) Service output tests
Minimum sample size for each test will be n=9. The batteries shall meet or above the minimum
average duration specified below.
Daily Period
M.A.D
Normal
6. Electrical characteristics and standard.
Unless otherwise stated, all inspections are conducted at 20±2℃, 55±20% RH after stabilization under
these conditions for a minimum period of 8 hours. All tests and examinations shall be started
within 30 days of receipt. Related sampling standard accordance with ISO 2859-1.
6.1) OCV (Open Circuit Voltage, NLV; No-load voltage)
OCV shall be measured on a voltmeter with the internal resistance ≥1 ㏁.
5.4) User Drop Test
This test simulates the situation when a battery is accidentally dropped. The batteries shall be no explosion
and leakage after hour.
Method) Undischarged test batteries shall be drop a height of 1M onto a concrete surface. Each test battery
shall be dropped two times at X, Y, Z axes.
Part Name
Alkaline Primary Battery - LR03
Version
C/0
Part No.
ALLKEY-LR03-2017
Page
5/9
Prepared Date
2017/1/3
Approved Date
2017/1/3
SPECIFICATIONS










