Installation Instructions

Americana Building Products .
26
Sierra Patio Cover Installation Guide
STEP 16
Fit the front of side gutter (F) (the end without the
bird block) into the fabricated corner of front gutter
(E) by angling the back of side gutter (F) away from
mounting channel (B).
Have assistance hold the front of side gutter (F) in
place. Fit the upper lip of side gutter (F) over the top
of mounting channel (B). The lower lip of side gutter
(F) should fit below mounting channel (B).
STEP 17
Attach side gutter (F) to mounting channel (B) using
(2) #8 x 3/4” screws (AA) through the upper lip.
Attach side gutter (F) to front gutter (E) using (2) #8
x 3/4” screws (AA) through the fabricated corner
and (2) #8 x 3/4” screws (AA) through the bottom.
16
17