Installation Instructions
Americana Building Products .
24
Sierra Patio Cover Installation Guide
13
14
SIDE VIEW
STEP 13
Position the lock of the next roof panel (V) over the
lock of the previous panel. Snap the locks together
by hooking the locks and rolling the panel down.
Slide the panel into mounting channel (B) until the
front end is flush with the previous panel. Repeat
steps 11-12 on page 23 to attach roof panel (V) to
mounting channel (B) and the header.
NOTE: It is very important to maintain the 8”
dimension between the center of the locks of each
roof panel (V). Standard units come pre-drilled for
easy installation. Line up the holes in the panels
with the holes in mounting channel (B) and header
(D).
Repeat for all remaining roof panels (V).
When you reach the end of the cover, remove
the last panel before installing the second-to-
last panel. Then re-install the end panel.
Once all roof panels (V) are installed, tighten all
screws, bolts, and nuts at attachment points.
STEP 14
Install a fascia clip (J) on each roof panel (V)
through the pre-punched square hole at the front of
the panel.
Continue on page 25










