Installation Guide

- 2 -
M965902 (4/18)
2
3
HANDLE INSTALLATION
1
TRIM INSTALLATION
TRANSPOSED SUPPLY PIPING
OR BACK TO BACK INSTALLATION
Should the hot and cold water supply pipes have been transposed
making adjustment impossible, proceed as follows:
• Shut off water supply.
• Remove handle and rim. (Reverse steps 1 and 2).
• Remove check stops and re-install them transposed.
Important note: RED CHECK STOP is now on the right of
the mixer body and the BLUE CHECK STOP is now on the left.
Turn the water supply back on and perform the temperature
adjustment in step 4.
•Assemble HANDLES and TRIM.
TOP
2
2a
1
4
5
6
7
PINS
3
H
C
8
1
9
2
7
4
4a
3
5a
6
5
H
C
CHECK STOP
(RED TO BLUE)
CHECK STOP
(BLUE TO RED)
Thread HANDLE SCREW (1) into VALVE STEM (2)
and tightento secure KNOB MOUNT (3).
• Align HANDLE (4) and push onto KNOB MOUNT (3).
Tighten SET SCREW (5) in handle with HEX
WRENCH (6) SUPPLIED.
Install HANDLE ADAPTER (7) onto TEMPERATURE
CONTROL KNOB (8) and tighten with SCREW (9).
Align HANDLE (4a) and push onto TEMPERATURE
CONTROL KNOB (8).
Tighten SET SCREW (5a) in handle with HEX
WRENCH (6) SUPPLIED.
Remove PLASTER GUARD (1) if attached.
Push CAPS (2 & 2a) as shown onto
CONTROL VALVES (3).
Push ESCUTCHEON HOLDER (4) with lightly
greased O-RING SEALS (5) over CAPS (2, 2a).
Attach with the two SCREWS (6) provided.
Align pins in back of ESCUTCHEON (7) with
holes in ESCUTCHEON HOLDER (4) and push
ESCUTCHEON (7) into place.