Installation Guide

- 2 -
FITTING
MOUNTING
DECK
VALVE
LOCKING
3
SPOUT
SHANK
HOT
COLD
2
4
6
5
1
VALVE
LOCKING
M965948 (8/18)
2
• Remove PLASTER GUARDS.
Thread INSERT (1) into SIDE VALVE (2) until it touches the
installation surface.
Thread INSERT (3) into SIDE VALVE (4) until it touches the
installation surface.
Tighten COUPLING (5) into TEE (6) for products without
hand shower.
VALVE ASSEMBLY
INSTALL HANDLES
3
Turn VALVE to OFF position.
Push ADAPTER (1) on VALVE STEM (2), so that the hole of the ADAPTER (1) without a spline is facing up. Fig. A.
Tighten STEM SCREW (3) to secure ADAPTER (1).
Align DECK ADAPTER (5) to LEVER HANDLE ASSEMBLY (4). Push LEVER HANDLE
ASSEMBLY (4) onto DECK ADAPTER (5) rmly to ush against mounting surface.
4
TOP
SPLINE END DOWN
Fig. A.
FEMALE TEETH
1
2
3
5
MALE TEETH