Installation Instructions

- 2 -
1
M965784 (6/17)
2
HANDLE INSTALLATION
Remove PLASTER GUARD (1) if attached.
Push CAPS (2 & 2a) as shown onto
CONTROL VALVES (3).
Push ESCUTCHEON HOLDER (4) with lightly
greased O-RING SEALS (5) over CAPS (2, 2a).
Attach with the two SCREWS (6) provided.
Align pins in back of ESCUTCHEON (7) with
holes in ESCUTCHEON HOLDER (4) and push
ESCUTCHEON (7) into place.
TRIM INSTALLATION
Install HANDLE ADAPTER (3) on to VALVE STEM (2).
Thread HANDLE ADAPTER SCREW (1) into VALVE STEM (2)
to secure HANDLE ADAPTER (3).
Align HANDLE (4) and push onto HANDLE ADAPTER (3).
Tighten SET SCREW (5) in handle with HEX WRENCH (6)
SUPPLIED.
Install HANDLE ADAPTER (7) onto TEMPERATURE
CONTROL KNOB (8) and tighten with SCREW (9).
Align HANDLE (4a) and push onto TEMPERATURE
CONTROL KNOB (8).
Tighten SET SCREW (5a) in handle with HEX WRENCH (6)
SUPPLIED.
3
TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION
Should the hot and cold water supply pipes have been transposed making
adjustment impossible, proceed as follows:
– Shut off water supply.
– Remove handle and rim. (Reverse steps 1 and 2).
– Remove check stops and re-install them transposed.
Important note: RED CHECK STOP is now on the right of the mixer body
and the BLUE CHECK STOP is now on the left.
Turn the water supply back on and perform the temperature adjustment in step 4.
Assemble HANDLES and TRIM.
HOT
COLD
TOP
2
2a
1
4
5
6
7
PINS
3
HOT
COLD
8
1
9
2
7
4
4a
3
5a
6
5
CHECK STOP
(RED TO BLUE)
CHECK STOP
(BLUE TO RED)