Installation Guide
M968592 Rev.1.3
1
INSTALL VALVE TRIM
1
Figure 1.
Figure 2. Figure 3.
3
5
6
4
2
1
Figure 1. Remove plaster guard from valve. Push CAP (1)
over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)
and attach with LONG SCREWS (4). Mount ESCUTCHEON
SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT
SCREWS (6).
Figure 3. Align PINS (7) on back side of ESCUTCHEON (8)
with the FOUR HOLES (9) in ESCUTCHEON SUPPORT (5)
and press ESCUTCHEON (8) flush against finished wall.
PLSTER
GUARD
9
5
7
8
5
2
INSTALL TRIM
Remove PIPE PLUG and CAP (1, 2) from shower pipe and tub
filler pipe.
Install SHOWER ESCUTCHEON (3) onto SHOWER
ARM (4). Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (4) and thread longer
leg of SHOWER ARM (4) into shower elbow.
Thread SHOWER HEAD (5) onto SHOWER ARM (4).
Install TUB SPOUT (6). Tighten with HEX WRENCH supplied.
1
2
CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when installing.
Note: Apply sealant or Teflon Tape to shower arm.
6
4
HEX WRENCH
APPLY SEALANT OR
TEFLON TAPE TO THREADS
1-3/4"
3