Installation Instructions

TOP
M968683 REV.1.1
M968683 REV.1.1
1
Remove PLASTER GUARD (1) if attached.
Push CAPS (2 & 2a) as shown onto CONTROL
VALVES (4).
Push ESCUTCHEON HOLDER (3) with lightly greased
O-RING SEALS (5) over CAPS (2, 2a). Attach with the
two LONG SCREWS (6) provided.
Attach ESCUTCHEON (7) to ESCUTCHEON HOLDER (3)
with the two SHORT SCREWS (8) provided.
Align pins in back of DIAL PLATE (9) with holes in
ESCUTCHEON (5) and push DIAL PLATE (9) into place.
1
TRIM INSTALLATION
2
INSTALL HANDLES
Should the hot and cold water supply pipes have been transposed making
adjustment impossible, proceed as follows:
TRANSPOSED SUPPLY PIPING
OR BACK TO BACK INSTALLATION
3
Remove check stops and re-install them transposed.
Shut off water supply.
Remove handle and rim. (Reverse steps 1 and 2).
CHECK STOP
(RED TO BLUE)
Turn the water supply back on and perform the temperature adjustment in step 4.
Assemble HANDLES and TRIM.
CHECK STOP
(BLUE TO RED)
Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE
CHECK STOP is now on the left.
1
5
3
4
6
2
4
1
3
5
6
2
7
4a
7
9
8
Push TEMPERATURE-CONTROL KNOB (1) (with the red stop button)
onto KNOB MOUNT (2).
Install HANDLE SCREW (3) and tighten with screwdriver.
Push KNOB CAP (4) into TEMPERATURE-CONTROL KNOB (1).
Push VOLUME-CONTROL KNOB (5) onto KNOB MOUNT (6).
Install HANDLE SCREW (7) and tighten with screwdriver.
Push KNOB CAP (4a) into VOLUME-CONTROL KNOB (5).