Operating instructions

6 Numbers in [brackets] are for 50 Hz international systems. Pub. No. 18-HE53D1-5
Installer’s Guide
8. Use transition fittings where return air duct dimensions
do not match the air cleaners opening dimensions.
Gradual transitions are preferred for greatest efficiency.
Four inches per linear foot (approximately 20° angle)
should be allowed, space permitting.
9. Seal all joints in the return air system to prevent dust
from entering the air stream.
NOTE: Do NOT use a silicon based sealant. This
causes a coating on the FIELD CHARGER pins that will
decrease the efficiency of the air cleaner.
C. DOOR OPERATION
The air cleaner comes with the Power Door installed on the
unit. The Power Door and the internal components will
need to be removed before installation. Follow these
guidelines for removing and re-installing the door:
REMOVING THE POWER DOOR:
Figure 9
Step 2: Rotate the door to fully remove from the air
cleaner. See Figure 10.
Figure 10
REINSTALLING THE POWER DOOR:
Step 1: Hold door so that tabs are aligned with slots in
cabinet as shown in Figure 11.
Step 2: Insert tabs into cabinet slots. Edge of door
should fit into channel against gasket (see detail). See
Figure 12.
Step 3: Rotate door to closed position. Ensure ends of
door overlap the cabinet (see detail). See Figure 13.
Step 4: Rotate latches to secure door as shown in Figure
14.
Step 1: To remove the door, hold handles and rotate
latches as shown in Figure 9.
Rotate Latches
Rotate door away from unit to remove
Figure 11
Gasket
Figure 12
Cabinet Edge
Figure 13
D. INSTALLATION GUIDELINES
* UPFLOW FURNACE AND UPFLOW AIR
HANDLER INSTALLATION
* DOWNFLOW AIR HANDLER INSTALLATION
1. Rotate the two quarter turn latches on the Power Door
outward then rotate the Power Door to remove it from
the cabinet. See Door Operation Section C. Remove
the PRE-FILTER, FIELD CHARGER, and both COL-
LECTION CELLS. Set the components aside until the
cabinet is installed and the indoor unit is in place.
2. Install the self-adhesive gasket material on the side of
the air cleaner cabinet flange that will mate with the
Figure 14