NOTE: Fold Over Tub installations will be butted against the Front Leveling Stringer assembly.
See Fig. 7 above (Front of Fold Over Tub - Side View).
DRAIN CONNECTION
Using recommended drain opening, connect bath drain to waste line. Tighten all drain joints securely.
FRONT OF FOLD OVER EDGE TUB
SIDE VIEW
3
755138-100 Rev. A 8/17
4
2
A.) THIS BATH MUST BE SUPPORTED ALONG IT'S ENTIRE BOTTOM. We recommend the use of mortar as bedding
material (sand is not recommended). Apply enough bedding to support the complete bottom of the bath. After the bedding
has been poured, and before it sets, position the bath within the recess until the rim is leveled against the leveling
stringers. The rim of the bath MUST NOT support weight. Allow the bedding material to completely harden before applying
weight to the rim or bottom of the bath.
C.) Any finish material such as tile or wallboard must be self-supporting if it contacts the deck of the bath.
Flooring will be butted against the bottom of the tub apron, also holding the tub in place.
B.) Check level front to back and side to side, shim as necessary. To secure the tub to wood studs, use drywall screws with
flatwashers or roofing nails immediately above the flange of the bath. To secure the tub to steel studs, use 4" (102mm)
drywall screws and flatwashers. (see Fig. 6)
SUGGESTED BATH
INSTALLATION METHOD
SECURE THE BATH TO THE STUDS AS SHOWN FOR
WOOD OR STEEL STUD CONSTRUCTION.
TYPICAL FLANGE MOUNTING DETAIL
STUD
WATERPROOF DRYWALL
OR CEMENT BOARD
WATERPROOF
DRYWALL
OR CEMENT
BOARD
TILE
SEALANT
TUB
1" x 3" (25 x 76mm) WOOD
2x4 STRINGER FULL LENGTH
1" x 3" (25 x 76mm) WOOD
2x4 STRINGER FULL LENGTH
STEEL
STUD
WASHER
TILE
SEALANT
TUB
4" (102mm)
DRYWALL
SCREW
DRYWALL SCREW
OR
ROOFING NAIL
WASHER
WOOD
STUDS
STEEL
STUDS
2x4 FRONT
LEVELING
STRINGER
WOODEN
TUB SUPPORT
TUB
TILE
WATERPROOF
DRYWALL OR
CEMENT BOARD
2x4 SUPPORT
VERTICAL 2x4
SUPPORT
Fig. 6