Installation Guide
4
710286-100 Rev. A
2A
2B
INSTALLATION NOTES
1
(6) Wall Post
(7 & 21) Door Post
VIEW FROM LEFT SIDE - INSIDE
This unit is best installed by two people.
Cover drain with tape prior to installation to prevent the loss of small parts.
Unpack your unit carefully and inspect for freight damage. Lay out and identify all parts using instruction sheet as a
reference. Before discarding the carton check to see that no small hardware parts have fallen to the bottom of the box. If
any parts are damaged or missing refer to the description noted in the instructions when inquiring about replacements.
Handle the glass panels carefully and protect the edges. Although tempered glass is very resistant to breakage the glass
can still break if unequal pressure is applied during installation and the sharp corners of the panel can damage tile and
ooring surface.
Be sure to wear safety glasses whenever drilling or cutting. When drilling holes in ceramic tile or marble use a center
punch and hammer to carefully break the glazed surface. This will prevent skidding when drilling.
NOTE: TEMPERED GLASS CANNOT BE DRILLED, CUT OR MODIFIED.
1A
ASSEMBLE FRAME - REFER TO ASSEMBLY DRAWING
Slide Horizontal Rails (9 & 17) onto Door Posts (7 & 21)
and screw together. Refer to Assembly Drawing to determine
correct location of Fixed Glass Panel.
Slide Wall Posts (6) on each end. The Wall Posts fit inside
posts of the frame.
1A - 1B
2A - 2B
1B
VIEW FROM RIGHT SIDE - INSIDE
7
9
21
17
Screw M4x35
VIEW FROM INSIDE
Screw M4x35
Flat Head
Screw
M4x35