Installation Guide
- 2 -
770035-100 Rev. A
VANITY INSTALLATION
Unpack unit carefully, taking care that bottom shelf does not drop and damage front legs (see Figure 2).
Provide suitable reinforcement for anchoring the vanity to the wall. Centerline of reinforcement should be 27" up from the
floor (see Figure 1).
Rough in supply lines and waste per rough-in dimensions.
The molding needs to be notched to seat the vanity flush against the wall.
Move the vanity into place and level with the adjustable glides on the bottom of the feet.
The glides can be adjusted outward up to 1" but it is recommended not to exceed 1/2" if possible.
Drill at least two 3/8" O.D. anchoring holes through the centerline of the rear stringer of the vessel stand, located
approximately 6” down from the top of vanity (see Figure 2).
Anchor the vanity to the wall through at least 2 of the anchoring holes in the rear of the vanity (see Figure 2).
Continue with installation appropriate for top and sink options chosen.
C/L of 2 x 6
Reinforcement
Finished
Floor
27"
FIGURE 1
FIGURE 2
ANCHOR VANITY
TO WALL USING
REAR STRINGER
WASTE LINE
SUPPLY
LINES
FINISHED
WALL
FINISHED
FLOOR
19-1/2"
(496mm)
3
(76)
6
(150)
REAR STRINGER
WITH ANCHORING HOLES
TO SECURE VANITY
TO WALL
ADJUSTABLE
LEVELLERS
(Under each Leg)
34-1/8"
(868mm)
TROPIC GRANDE
PEDESTAL SINK
OPTION
MARBLE TOP
WITH ORBIT
UNDERMOUNT
SINK
27"
(686mm)