Installation Guide
- 3 -
770034-100 Rev. A
VANITY INSTALLATION - WALL HUNG VANITY
Unpack Tropic 20" Vanity 9212020 carefully, taking care that bottom of unit does not drop and damage door handles (see Figure 1.2).
Provide suitable reinforcement for anchoring the vanity to the wall. Centerline of reinforcement should be 26-1/4" up from
the floor (see Figure 1.1).
Rough in supply lines and waste per rough-in dimensions (see Figure 1.1).
Decorative molding may need to be notched to seat the vanity flush against the wall.
Secure and level the J-Rail (1) to the wall 25-1/4" from the floor to bottom edge of the J-Rail (1) (see Figure 1.1).
Lift the vanity and hang the Top Rear Stringer of the vanity onto the J-Rail (1).
Drill at least two 3/8" O.D. anchoring holes through the centerline of the Bottom Rear Stringer of the vanity.
Anchor the vanity securely to the wall through the Bottom Rear Stringer of the vanity (see Figure 1.2).
Continue with installation appropriate for top and sink options chosen.
C/L OF 2 X 6
REINFORCEMENT
FINISHED
FLOOR
TOP REAR STRINGER
FIXED TO VANITY
HOOKS INTO J-RAIL (1)
TOP REAR STRINGER
HANGS ON J-RAIL (1)
THAT IS ANCHORED
TO WALL
ANCHOR VANITY
TO WALL USING
BOTTOM REAR
STRINGER
J-RAIL MOUNTS
TO WALL TO
HANG VANITY
SECURE BOTTOM
REAR STRINGER
TO WALL
25-1/4" (641mm)
UNDERSIDE OF
J-RAIL
1
TOP REAR
STRINGER
26-1/4"
(667mm)
FIGURE 1.1
FIGURE 1.2
1
36"
(917mm)
26-1/4"
(667mm)
25-1/4"
(642mm)
18"
(460mm)
2"
(51mm)
8-1/8"
(206mm)
DOOR HANDLES