Installation Guide
FINISHED FLOOR
O-Rings
APPLY SEALANT
• Move HANDLE (24) onto “off” position.
• Turn on water supplies and check all connections for leaks.
Check MANIFOLD (25) connections for leaks.
• Apply sealant to underside edge of ESCUTCHEON (26). Slide
ESCUTCHEON (26) down to nished oor. Press into place.
Clean up excess sealant.
• Operate HANDLE (24) On to Off and Hot to Cold to ush water
lines thoroughly.
• Lift HAND SHOWER (22) from the HOLDER (23) and direct spray into
tub. Rotate DIVERTER KNOB (27) and check HAND SHOWER (22)
and SPRAY HOSE (20) connections for leaks.
• Rotate DIVERTER KNOB (27) back and place HAND SHOWER (22)
into HOLDER (23).
TEST INSTALLED FAUCET
• Align PIN (13) in FAUCET BASE (14) with HOLE (15) in SPOUT BASE (16). Install
SPOUT (17) into FAUCET BASE (14). Tighten the two SET SCREWS (18).
• Install SEALS (19) on both ends of the SPRAY HOSE (20). Connect the end with
the hex to the DIVERTER (21) using an adjustable wrench. Hand tighten the
connection to the HAND SHOWER (22).
Note: When not in use, the HAND SHOWER (22) should
be seated in the SHOWER HOLDER (23).
INSTALL SPOUT AND HAND SHOWER
9b
25
20
24
17
15
13
18
19
21
22
27
23
17
14
16
26
7
M965639 REV. 1.2 (8/15)