Installation Guide
• Complete the installation of the Finished Floor. Tile as close to the PLASTER GUARD (3) as you can.
• Caulk between Finished Floor and PLASTER GUARD (3).
4
REMOVE EXPOSED PLASTER GUARD
6
• Cut the exposed part of the PLASTER GUARD (3) ush with the nished oor. Be careful not not damage the oor.
FINISH FLOOR INSTALLATION
5
1
HOT
COLD
FRONT
FINISHED FLOOR
ROUGH FLOOR
3
3
1
HOT
COLD
FRONT
FINISHED FLOOR
M965639 REV. 1.2 (8/15)