Installation Instructions
3
M965832 (6/17)
1
2
3
4
5
6
7
8
10'
-C-L-
152 mm
(6)
(Min.)
*Note: The Critical Line (-C-L-) on Vacuum Breaker
must typically be 6
" (152mm) minumim above fixture.
Consult Codes for details.
*CRITICAL
LEVEL
SUPPLY
DN 19 mm
(3/4" I.P.S.
For 3/4"
Top Spud)
108 mm-133 mm
(4-1/4" to 5-1/4")
147 mm
(5-13/16")
295 mm
(11-1/2")
253 mm
(9-15/16")
FINISHED WALL
3/4" VACUUKM
BREAKER SHOWN
135 mm
(13-1/2")
38 mm-127 mm
(1-1/2-5")
-C-L-
Right or Left Hand Installation
Roughing-in Dimensions
Fig.1
Fig.2
PRIOR TO INSTALLATION
Note: Prior to installing the Flush Valve the following
items must be installed.
1. Urinal
2. Drain line
3. Water supply line
IMPORTANT:
• All plumbing must be installed in accordance with
applicable codes and regulations.
• The use of water hammer arrestors is strongly
recommended for commercial applications. All
piping behind the walls should be properly secured
and fastened.
• Water supply lines must be sized to provide an
adequate volume of water for each xture.
• Flush all water lines prior to operation
(See Step 5). Dirt and debris can cause ush
valve to run continuously.
• With the exception of Supply Stop Inlet,
DO NOT use pipe sealant or plumbing grease
on any valve component or coupling!
• Protect the chrome or special nish on the
Flushometer. DO NOT USE toothed tools on
nished surfaces to install or service these
valves. Also see “Care and Cleaning” section
of this manual.
• This product contains mechanical and/or
electrical components that are subject to
normal wear. These components should be
checked on a regular basis and replaced as
needed to maintain the valve’s performance.
GENERAL DESCRIPTION
MANUAL FLUSH VALVE, 0.5 GPF
Exposed Flushometer
for 3/4" Top Spud Fixtures
• 20 psi (owing) - 80 psi (static)
FLOW REQUIREMENT:
• 10gpm (37.9 L/min).
** Water pressure over 80 psi is not
recommended with most plumbing xtures
RECOMMENDED TOOLS; Fig. 2
1. Teon Tape
2. Flat Blade Screwdriver (For adjusting Supply Stop)
3. Adjustable Wrench
4. Tape Measure
5. Hacksaw
6. Tubing Cutter
7. File
8. For Sweat Connection; Solder and Torch
See (Section 8) for converting
Flush Valve to Left Hand Installation.