18 11-AC46D1-1B-EN
Indoor Wet Bulb Temp (F)
Outdoor
Dry
Bulb
Temp.
(F)
50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
55 7 9 10 11 12 14 15 17 18 20 21 23 24 26 27 29 30
60 5 7 8 9 10 12 13 15 16 18 19 21 22 24 25 27 28 30 31
65 4 6 8 10 11 13 14 16 17 18 19 21 22 24 25 27 28 27 31
70 5 7 8 10 11 13 14 16 17 18 19 21 22 24 25 27 28 30 31
75 5 6 7 9 10 12 14 16 18 19 21 22 24 26 28 29 31 32
80 4 6 7 9 10 11 12 14 16 18 19 21 23 25 26 28 29 31 33
85 4 6 7 9 10 13 14 16 18 20 21 23 24 26 28 29 30 31 32
90 4 6 8 10 11 13 14 16 18 20 22 24 25 27 28 30 31
95 4 6 8 10 13 14 16 18 20 22 23 25 26 28 29
100 6 8 10 12 13 16 18 20 21 23 25 27 29
105 4 6 7 9 11 13 15 18 20 22 24 26 28
110 4 7 9 11 13 16 18 21 23 26 28
115 6 9 12 14 16 19 21 24 26
Using a digital psychrometer, measure the return air wet-bulb temperature at the unit just before the coil. Also measure the outdoor dry-bulb tem-
perature. Use these temperatures to locate the target superheat on the charging table. Do not attempt to charge the system if these conditions fall
outside of this charging table.
ADD refrigerant to DECREASE total superheat. REMOVE refrigerant to INCREASE total superheat. Always allow 10 to 15 minutes of operature
after any refrigerant or air flow change prior to determining the final superheat.
Fixed Orifice Superheat Charging Table
Weigh-In Method can be used for the initial
installation, or anytime a system charge is being
replaced. Weigh-In Method can also be used
when power is not available to the equipment
site or operating conditions (indoor/outdoor
temperatures) are not in range to verify with the
subcooling charging method.
14.3 Weigh-In Method for Charging
Calculating Charge Using the Weigh-In Method
STEP 1 - Measure in feet the distance between
the outdoor unit and the indoor unit and record on
Line 1. Include the entire length of the line from
the service valve to the IDU.
STEP 2 - Enter the charge multiplier (0.6 oz/ft).
Each linear foot of interconnecting tubing requires
the addition of 0.6 oz of refrigerant.
STEP 3 - Multiply the total length of refrigerant
tubing (Line 1) times the value on Step 2. Record
the result on Line 3 of the Worksheet.
STEP 4 - This is the amount of refrigerant to
weigh-in prior to opening the service valves.
1. Line length (ft) ______________
2. Charge multiplier x ____ 0.6 ______
3. Step 1 x Step 2 = _____________
4. Refrigerant = _____________