Installation Guide
755116-100
6
7
6
Install temporary braces to hold the center
of the corner and side panels tight to the
studs for approximately 24 hours while
adhesive sets. Add cushioning between
panels and braces to prevent scratching
the panels.
When installing greenboard, position
drywall screws above the top nailing
flange. If you choose to screw
through the nailing flange, you
MUST drill clearance holes in the
flange to avoid cracking/damaging
the flange.
8
A) After greenboard is installed, apply finished sealant bead to all edges and joints. Follow sealant manufacturers’
recommended cure time.
B) Make connections to supply and drain lines.
Green Board