Installation Guide
755452-100 Rev. 2 9/19
2
1
Ensure that the floor and stud walls are square and plumb on a level
floor as shown in Figure A. Provide a 6" x 6" (152 x152mm) opening
in the floor for the drain and refer to the product chart for actual drain
location. The lower portion of the drain mount must t into the 6"x 6"
opening. Check by dry tting the shower base in the nal location.
Draw a line 3-7/8" (98mm) above the level subfloor on the wall studs
at each side of the opening.
FIGURE A
NOTE: Shower bases are to be installed on sub-oors not nished oors. Shower
bases will drain properly provided they are installed on a level surface.
Check the oor with a long level. A long level is more likely to detect level of
sub-oor at its greatest dimensions. Check front-to-back at the left and right sides
and at the center. Repeat for side-to-side dimensions. Finally check the diagonals.
Depending on the results, some additional prep work may be necessary.
6438AMFCOL
6434AMFCOL
FRONT
RIGHT SIDE (SECTIONED)
TOP VIEW
FCO
1-3/8" (34mm)
1" (25mm)
1" (26mm)
THRESHOLD DEPTH
64"
(1625mm)
34"
(863mm)
32"
(812mm)
29-1/4"
(743mm)
FRONT
RIGHT SIDE (SECTIONED)
TOP VIEW
DCA
1-3/8” (34mm)
1” (25mm)
1” (26mm)
THRESHOLD DEPTH
64”
(1625mm)
32”
(812mm)
33-1/4”
(845mm)
38”
(965mm)
90°
90°
2" (51 mm)
PVC Waste Pipe
6" x 6"
(152 x152 mm) Opening
C/L
(See Product Chart for Drain Location)
MARK STUDS 3-7/8" ABOVE LEVEL SUBFLOOR