Installation Guide

3
755117-100
3
4
2
DRY FITTING THE PANELS ON THE WALL
1) Starting with the two side panels, dry fit the panels on the
walls using the marks made in Step 1. Use Painter’s Tape
to hold the panels in place.
2) Remove the corner panel and mark the inner edges of the
side panels on the dry wall.
MARKING THE SIDE PANEL WITH THE PLUMBING
1) Measure the distance from the two lines to the centers of
the shower head and valve.
2) Mark the locations of the shower head and valve on the
panel that will have the plumbing installed.
3) Drill holes in the panel using holes saws that are large
enough for the opening but small enough to be covered by
the trim plates.
APPLYING TUB SURROUND ADHESIVE TO DRYWALL AND
SEALANT TO SHOWER BASE
1) Apply tub surround adhesive to one side of the dry wall in a
zig-zag pattern.
2) Use a notched trowel to spread the adhesive evenly on the
wall. Be sure to stay within the marked lines.
3) Apply sealant to shower base where it will contact wall panel.
NOTE – DO ONLY ONE WALL AT A TIME.
Mark for
plumbing
fixtures