Installation Guide
5
6
FINAL DRY FIT
APPLICATION OF ADHESIVE, SIDE PANELS
5a. Once all the panels are dry fitted correctly in place
with no gaps, secure the bottom of each side panel
to the tub/base with tape.
5b. Remove the Rear Wall Panel and mark both Left and
Right Wall Panel locations, top and bottom, so when
the Side Panels are removed for the addition of ad-
hesive on the OSB board, the panels can be returned
back to the same locations.
5c. Unscrew and remove both Left and Right Side Panels.
MARK
SIDE WALL
LOCATIONS
5A
6a. Starting with either Left or Right Side Panel, apply
adhesive with at least 3/16" bead around the outer
edges of the OSB board and in vertical lines with
6" spacings as illustrated. NOTE: Each Side Panel
will use approximately 2 tubes of adhesive; if any
remains after completing the application pattern,
apply remaining amounts on OSB in dollops until
tubes are empty.
6b. Install the Side Panel back into the previously
marked position from step 5, check for plumb
and screw panel back in place.
6c. Press on the outside surface of the panel in the
area where the OSB board and adhesive is applied
to ensure good contact of the adhesive to the
inside of the Side Wall Panel. Install the opposite
Side Panel in the same manner.
VERTICLE LINES
6" SPACING WITH AT
LEAST 3/16" BEAD