Installation Guide
2
TUB INSTALLATION
2a. Make sure the apron brackets are securely attached. (Figure 1)
2b. Place tub into studded alcove. (Figure 2)
2c. Check level front to back and side to side, shim as necessary (Figure 3). NOTE: Ensure the feet of the
tub are touching the oor. Shim as necessary or use optional mortar to level. Mortar is recommended for
support of weight exceeding 300 lbs. To secure the tub to wood studs, attach metal ange clips (Figure
2) to corners of tub as illustrated and secure clips to the studs.
2d. Bend the tabs of the metal clip over tub ange to secure tub (Figure 2).
2e. Add plastic clips to tub ange at all remaining stud locations to anchor tub to alcove. (Figure 4)
2f. Any nish material such as tile or wallboard must be self-supporting if it contacts the deck of the bath.
Flooring will be butted against the bottom of the tub apron, also holding the tub in place.
APRON BRACKET LOCATION
APRON
TUB
60"
(1524 mm)
METAL
CLIPS
TAB
SUGGESTED BATH
INSTALLATION METHOD
SECURE THE BATH TO THE STUDS AS SHOWN FOR
WOOD OR STEEL STUD CONSTRUCTION.
STUD
WATERPROOF DRYWALL
OR CEMENT BOARD
WATERPROOF
DRYWALL
OR CEMENT
BOARD
TILE
SEALANT
TUB
STEEL
STUD
TILE
SEALANT
TUB
4" (102mm)
DRYWALL
SCREW
EXTERIOR RATED SCREW
OR
ROOFING NAIL
WOOD
STUDS
STEEL
STUDS
TUB
FLANGE
STUD
FIGURE 1
FIGURE 4
FIGURE 3FIGURE 2
FIGURE 5