Specifications

M965274 REV. 1.2
4
ELECTRICAL INSTALLATION
ELECTRICAL CONNECTIONS; Fig. 1
1
CAUTION
Before opening ENCLOSURE
turn off power from electrical box .
NOTE: Make power supply connection before
mounting ENCLOSURE (1) to wall. Fig. 1b.
1. Remove ENCLOSURE COVER (1). Fig. 1.
2. Feed the EXTENSION CABLES (2) from the Faucet
through the top of ENCLOSURE (3). Fig. 1a.
3. Remove SPLIT PLUG (4) from POWER SUPPLY
GROMMET (5). Insert POWER CORD (7) into SPLIT
PLUG (4). Insert POWER CORD CONNECTOR (6)
through POWER SUPPLY GROMMET (5). Push SPLIT
PLUG (4) into POWER SUPPLY GROMMET (5) to seal.
Fig. 1b.
4. Insert POWER CORD CONNECTOR (6) through
GROMMET (8) as shown. Fig. 1c.
5. Connect SOLENOID CABLE (9) and POWER CORD
CONNECTOR (6) to EXTENSION CABLES (2) from
Faucet Sensor. Fig. 1d.
6. Replace ENCLOSURE COVER (1). Tighten cover
screws firmly.
7. Contractor to supply ELECTRICAL BOX (10)
and power to POWER SUPPLY (11). Mount POWER
SUPPLY (11) into ELECTRICAL BOX (10). Connect
White and Black connections to POWER SUPPLY
CONNECTIONS (12). Fig. 1e.
8. Connect the EXTENSION WIRE (6a) to the POWER
SUPPLY CABLE (13). FIG. 1e.
Fig. 1a
Fig. 1
Fig. 1c
6
9
2
Fig. 1d
2
3
4
7
5
Fig. 1b
6
1
6
8
Fig. 1e
BLACK & WHITE
POWER
CONNECTIONS
POWER TO
FAUCET SENSOR
13
11
CONNECTOR NOT
USED IN THIS
INSTALLATION
6a
6
12
4" ELECTRICAL BOX
OR EQUIVALENT BY
OTHERS
TO ELECTRICAL BOX
WITH POWER SUPPLY
TO ELECTRICAL BOX
WITH POWER SUPPLY
10
CAUTION: Use only American Standard
supplied cable sets. Using non-AS supplied
cables, or cutting, splicing or modifying any
components will void the warranty.