Technical information
Sizing of protections
Protection from the short circuit (BCPD) remains the same and is calculated over
the entire FLA of the motor.
The thermal protection m
ust be installed downline from the line contactor(M1)
and with calibration of no more than 1.15 times the 57.7% of the motor's FLA.
Attention must be paid to this requirement because very often a single overload
relay is used as protection both thermally and magnetic but it is not accepted in
this circuit schematic since it does not guarantee protection while the motor is
starting up.
Sizing of conductors
The conductors, internal and external that bring the current to a wye-delta
starting must be scaled on the basis of a factor of 1.25 (as already described); the
reference current however changes, it is reduced to 57,7% of the motor current.
1.5 Group Installation
One of the main characteristics of the North American standard is the fact that
they provide for “group installation”, i.e. group installations that are regulated by
specific instructions.
In general, these are installations in groups when there is a circuit where a single
protection against short circuits (BCP) protects all the loads at once: the motor
group installation (several motors down line from the same BCP) will be
analysed later on. Note that each motor must have its own protection from
overloads.
1.5.1 Dimensioning of branch circuit protections
The UL508A standard and the NEC provide for two or more motors (but also one
or more motors and other loads) being able to be protected by a single branch
circuit protection if they respect at least one of the listed cases:
1) When the BCP does not exceed 20 A at 125 V or 15 A at 600 V or less and
•the full load current of each motor,FLA, does not exceed 6 A; and
•the calibration and the type of protection of the branch circuit are co-
ordinated with the restrictions of the components down line (i.e. indicated
on the marking of the component);
2) When the calibration is the BCP type they respect the scaling parameters
(previously defined) for each motor in the assembly.The start up of the largest
motor must not cause untimely cut ins i;
3) When all the power components down line from the BCP protection are
approved for the group installation, as indicated by the marking (of the
NRTL certifier) on the component or on the instructions supplied with the
components.
BRANCH CIRCUIT