Instructions / Assembly
American Spa Owner’s Manual
LTR50001143, Rev. ZZ4
Preparing for Your New Portable Spa
5
Opening the Front Door Panel for Electrical Hookup
The following electrical connections must be performed by a licensed electrical contractor. Unscrew
and remove the two corner panels on each side of the spa’s front door.
Remove the front door panel.
Pictured to the right is the inside of the spa behind the
front door. The electrician now has access to connect
the spa for power. While the front door is o, refer
to page 10 for instructions on ensuring the plumbing
ttings are secure (but do not be tempted to over-
torque or over-tighten these ttings).
Reattach and screw panels back in. (Front door is
installed rst, then install the corner panels.)
Note that the drain pipe is internal to
the cabinet.