Specifications
SPEEDDOME ULTRA VI 8000-2830-03, REV. C
INSTALLATION AND SERVICE GUIDE 15 of 34
8. Connect the housing and eyeball assembly to
the base (Figure 14) by aligning the Cap and
Base tabs and then turning clockwise until you
hear a click.
Figure 14. Connecting housing and eyeball
assembly to base (cables and
lanyard not shown)
9. Wait a few seconds for dome to begin its
homing routine. Homing routine indicates that
address was placed into dome memory and that
dome is ready for programming.
Connecting to a Mounting Base
with I/O Board
This procedure explains how to connect the
housing and eyeball assembly to a mounting base
with I/O board.
CAUTION: The maximum length of cable allowed
between the Class 2 LPS (low voltage) ac source,
such as a J-box, and the dome is 250m (820').
WARNING! Ensure that ac power and electrical
signals are off during wire connections!
Referring to Figure 15:
CAUTION: Detach and discard cable clamp if I/O
board has one. If not removed, clamp can damage
9-pin connector in housing and eyeball assembly
when you attempt to connect it to base.
1. Set data communications jumper JW1. If data
lines continue to another dome, set JW1 across
pins 1-2 (unterminated). Otherwise, set JW1
across pins 2-3 (terminated).
2. Connect video cable to BNC connector P8 on
I/O board.
3. Connect Manchester, RS-422, or SensorNet
485 data wires to connector P1.
Manchester data connections. Order data
cable 88760 (plenum) or 8760 (non-plenum)
from Belden by calling 1-800-235-3361.
Pin Color Designation
1-4 — Not used.
5 Black Manchester (+)
6 White Manchester (–)
RS-422 data connections
Pin Color Designation
1 Orange RS-422 Data In High (+)
2 Green RS-422 Data In Low (–)
3 Yellow RS-422 Data Out High (+)
4 Brown RS-422 Data Out Low (–)
5-6 — Not used.
SensorNet data connections
Pin Color Designation
1-4 — Not used.
5 Orange SensorNet (unshielded)
6 Yellow SensorNet (unshielded)
Align tabs on
Cap and Base.
Turn clockwise
to latch










