GENERAL CONDITIONS GC-48
11.4.4.3 The successful bid upon which the Contract is based was not more than ten
per cent below the next lowest bid or not more than ten per cent below a cost
estimate for the work as published by the Board.
11.5 Worker's Compensation Insurance
11.5.1 The Contractor shall take out and maintain during the life of the Contract Workers'
Compensation Insurance for its employees and shall furnish a certificate of Workers' Compensation
Insurance for its employees before the execution of the Agreement. No Contract between the Board
and the Contractor shall exist until a fully executed copy thereof has been served upon to the Board.
11.6 General Requirements
11.6.1 All insurance coverage procured by the Contractor shall be provided by insurance companies
licensed to do business in Ohio having policyholder ratings no lower than "A" and financial ratings
not lower than "XII" in the Best's Insurance Guide, latest edition in effect as of the date of the
Contract, and subsequently in effect at the time of renewal of any policies required by the Contract
Documents.
11.6.2 If the Board is damaged by the failure of the Contractor to purchase or maintain insurance
as required under Article 11, then the Contractor shall bear all reasonable costs (including, without
limitation, attorney fees and court and settlement expenses) properly attributable thereto in addition
to any other relief due the Board.
ARTICLE 12 - UNCOVERING AND CORRECTION OF WORK
12.1 Uncovering of Work
12.1.1 If a portion of the Work is covered contrary to the Engineer's or Board's request or to
requirements specifically expressed in the Contract Documents, it must, if required in writing by the
Engineer or the Board, be uncovered for the Engineer's or Board's observation and be replaced at
the Contractor's expense without change in the Contract Time. If prior to the date of Substantial
Completion, the Contractor, a Subcontractor, a Sub-subcontractor or anyone for whom either is
responsible uses or damages any portion of the Work, including, without limitation, mechanical,
electrical, plumbing and other building systems, machinery, equipment or other mechanical devise,
the Contractor shall cause such item to be restored to "like new" condition at no expense to the
Board.
12.1.2 If a portion of the Work has been covered which the Engineer or Board has not specifically
requested to observe prior to its being covered, the Board, or the Engineer with written consent of
the Board, may request to see such Work and it shall be uncovered by the Contractor. If such Work
is in accordance with the Contract Documents, costs of uncovering and replacement shall, by
appropriate Change Order, be charged to the Board. If such Work is not in accordance with the
Contract Documents, the Contractor shall pay such costs unless the condition was caused by the
Board or a separate contractor in which event the Board shall be responsible for payment of such
costs and may recoup such cost from such separate contractor as applicable.