Specifications

SECURITY CAMERA SYSTEM UPGRADE AND REPLACEMENT
FOR MONTGOMERY COUNTY DETENTION CENTER
GENERAL CONDITIONS GC-13
with minimum interference to traffic and other facilities. Streets, alleys, drives and other roads
adjacent to the site shall be maintained free of mud and construction debris created by the
construction process.
3.12.2 Only materials and equipment which are to be used directly in the Work shall be brought to
and stored on the Project site by the Contractor. After equipment is no longer required for the Work,
it shall be promptly removed from the Project site. Protection of construction materials and
equipment stored at the Project site from weather, theft, damage and all other adversity is solely the
responsibility of the Contractor.
3.12.3 The Contractor and any entity for whom the Contractor is responsible shall not erect any sign
on the Project site without the prior written consent of the Board, which may be withheld in the sole
discretion of the Board.
3.12.4 The Contractor shall ensure that the Work, at all times, is performed in a manner that affords
reasonable access, both vehicular and pedestrian, to the site of the Work and all adjacent areas. The
Work shall be performed, to the fullest extent reasonably possible, in such a manner that public areas
adjacent to the site of the Work shall be free from all debris, building materials and equipment likely
to cause hazardous conditions. Without limitation of any other provision of the Contract
Documents, the Contractor shall use its best efforts to minimize any interference with the occupancy
or beneficial use of (1) any areas and buildings adjacent to the site of the Work or (2) the building
in the event of partial occupancy, as more particularly described elsewhere in the Contract
Documents.
3.13 Cutting and Patching
3.13.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the
Work or to make its parts fit together properly.
3.13.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially
completed construction of the Board or separate contractors by cutting, patching or otherwise
altering such construction, or by excavation. The Contractor shall not cut or otherwise alter such
construction by the Board or a separate contractor except with written consent of the Board and of
such separate contractor. The Contractor shall not unreasonably withhold from the Board or a
separate contractor the Contractor's consent to cutting or otherwise altering the Work.
3.14 Cleaning Up
3.14.1 The Contractor shall keep the premises and surrounding area free from accumulation of
waste materials or rubbish caused by operations under the Contract. At completion of the Work the
Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools,
construction equipment, machinery and surplus materials.
3.14.2 If the Contractor fails to clean up as provided in the Contract Documents, the Board may do
so and the cost thereof shall be charged to the Contractor.