GENERAL CONDITIONS GC-5
3.1.2 The Contractor shall take field measurements and verify field conditions and shall carefully
compare such field measurements and conditions and other information known to the Contractor
with the Contract Documents before commencing activities. Errors, inconsistencies or omissions
discovered shall be reported to the Engineer and Board at once. Exactness of grades, elevations,
dimensions, or locations given on any Drawings issued by the Engineer or Board, or the work
installed by other contractors, is not guaranteed by either the Board or Engineer. The Contractor
shall, therefore, satisfy itself as to the accuracy of all grades, elevations, dimensions, or locations.
In all cases of interconnection of the Contractor's Work with existing or other work, Contractor shall
verify at the site all dimensions relating to such existing or other work. Any errors due to the
Contractor's failure to so verify all such grades, elevations, dimensions or locations shall be
promptly rectified by the Contractor at no additional cost to the Board.
3.1.3 The Contractor shall perform the Work in accordance with the Contract Documents and
submittals approved pursuant to Paragraph 3.11.
3.1.4 Except as to any reported errors, inconsistencies or omissions and to concealed or unknown
conditions defined in Paragraph 4.2.7, by executing the Agreement, the Contractor represents the
following:
3.1.4.1 The Contract Documents are sufficiently complete and detailed for the
Contractor to (1) perform the Work required to produce the results intended
by the Contract Documents and (2) comply with all the requirements of the
Contract Documents.
3.1.4.2 The Work required by the Contract Documents, including, without limitation,
all construction details, construction means, methods, procedures and
techniques necessary to perform the Work, use of materials, selection of
equipment and requirements of product manufacturers are consistent with:
(1) good and sound practices within the construction industry; (2) generally
prevailing and accepted industry standards applicable to Work; (3)
requirements of any warranties applicable to the Work; and (4) all laws,
ordinances, regulations, rules and orders which bear upon the Contractor's
performance of the Work.
3.2 Supervision and Construction Procedures
3.2.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and
attention. The Contractor shall be solely responsible for and have control over construction means,
methods, techniques, sequences and procedures and for coordinating all portions of the Work under
the Contract, unless Contract Documents give other specific instructions concerning these matters.
3.2.2 The Contractor shall be responsible to the Board for acts and omissions of the Contractor's
employees, Subcontractors and their agents and employees and any entity or other persons
performing portions of the Work under a contract with the Contractor.
3.2.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with
the Contract Documents either by activities or duties of the Engineer in the Engineer's