Specifications
SECURITY CAMERA SYSTEM UPGRADE AND REPLACEMENT
FOR MONTGOMERY COUNTY DETENTION CENTER
SECURITY CAMERA SYSTEM 17000-30
J. Products:
1. General: Products to support the systems described in this Section shall
be as defined in each Section of Division 17.
K. Execution:
1. General: It shall be the responsibility of this Contractor to furnish,
install, and integrate all systems as defined in Division 17.
2. Submittals shall define the method in which system integration will be
accomplished and specifically outline the functions and sequence of
activities of the console operator.
3. Division 17 Contractor shall be responsible for providing training by
authorized system installers/representatives to the Owner's personnel.
L. Testing:
1. All systems shall be tested individually and as an integrated system prior
to acceptance testing of the system(s) by the Owner or Owners
representative.
5. NEW MONITORING STATIONS - MONITORING AND CONTROL SYSTEM
A. General Conditions:
1. The Conditions of the Contract (General, Supplementary and other
Conditions) and the General Requirements (Sections of Division 1) are
hereby made a part of this Section.
B. Work Included:
1. Provide materials, labor, equipment, and services necessary to furnish,
deliver, and install two additional Wonderware HMI projects to the
existing security monitoring and control system. The new projects will
control the doors, intercoms, cameras, etc. as shown on the drawings, as
specified herein, and/or as required by job conditions. Additionally, the
existing Wonderware HMI projects will have to be edited to coordinate
their screens with the new project screens.
2. Major sub-systems include:
a. LCD control panel.
1. Wonderware HMI 7.1 or greater
2. Licencing of Wonderware provided to Owner
3. Windows XP Pro operating system
4. Dell high performance PC










