Q. Shop Drawings:
1. The Contractor shall not purchase any materials or equipment prior to
receipt of reviewed shop drawings from the Engineer.
2. Prior to assembling or installing the work, prepare and submit shop
drawings for approval in accordance with the General Conditions and as
hereinafter specified.
a. Shop drawings are required on all items of material and
equipment.
b. Scale drawings shall be prepared showing dimensional locations
in plan and elevation of all equipment. Where work is to be
performed within a municipality. approval shall be obtained from
proper authority before submitting shop drawings.
c. Submit catalog information, factory assembly drawings and field
installation drawings as required for complete explanation and
description of all items of equipment.
3. All submittals shall include adequate descriptive literature, catalog cuts,
shop drawings and other data necessary for the Engineer to ascertain that
the proposed equipment and materials comply with specification
requirements. Catalog cuts shall be legible and shall clearly identify
equipment being submitted.
4. Before preparing drawings. Contractor shall consult all contract drawings
and specifications in detail, including those for the General Construction
Contract, obtain manufacturer's recommended installation instructions, and
have shop drawings prepared based on specific equipment and material
intended for installation. A principal of the contracting firm shall sign all
shop drawings (indicating conformance with plans and specifications)
before submitting to the Engineer or releasing to workmen.
5. Review of shop drawings or schedules by Engineer shall not relieve the
Contractor from responsibility for deviations from drawings or
specifications, unless he has in writing (and in letter form) called attention
to such deviations at the time of submission and secured written approval;
nor shall it relieve him from responsibility for errors in shop drawings or
schedules.
6. Submittals for individual systems and equipment assemblies which consist
of more than one item or component shall be made for the system or
assembly as a whole. Partial submittals will not be considered.
7. Make submittals for the equipment and materials in accordance with the