Specifications
SECURITY CAMERA SYSTEM UPGRADE AND REPLACEMENT
FOR MONTGOMERY COUNTY DETENTION CENTER
SECURITY CAMERA SYSTEM 17000-6
only for the purpose of establishing general feasibility. They do not
obviate field coordination for the indicated work.
8. Information as to the general construction shall be derived from structural
and architectural drawings and specifications only.
9. The use of words in the singular shall not be considered as limited where
other indications denote that more than one item is referred to.
10. The drawings are diagrammatic and indicate the general arrangement of
systems and equipment. For exact locations of building elements, refer
to dimensioned drawings; however, field measurements take precedence
over dimensioned drawings. Report any discrepancies discovered between
security systems drawings and the drawings for other divisions of work
under the general construction contract.
L. Description of Systems:
1. Furnish and install all materials for systems, resulting upon completion.
in functioning systems in compliance with performance requirements
specified. The omission of express reference to any parts necessary for,
or reasonably incidental to, a complete installation shall not be construed
as a release from furnishing such parts.
2. The wiring specified and shown on the drawings is for complete and
workable systems. Any deviations from the wiring shown due to a
particular manufacturer's requirements shall be made at no additional cost
to the Owner. Changes in electrical service to equipment due to
substitutions of equipment by any contractors shall be at the cost of that
contractor.
M. Delineation of Work:
1. Division 17 Subcontractors are required to supply all necessary
supervision and coordination of information to any contractor who is
performing work to accommodate Division 17 installations. Where the
Division 17 Subcontractors are required to install items which they do not
purchase, they shall include for such items:
a. The coordination of their delivery.
b. Their unloading from delivery trucks driven in to any designated
point on the project property line at grade level.
c. Their safe handling and field storage up to the time of permanent
placement in the project.
d. The correction of any damage, defacement or corrosion to which
they may have been subjected.