Specifications
SECURITY CAMERA SYSTEM UPGRADES AND REPLACEMENTS
FOR MONTGOMERY COUNTY DETENTION CENTER
ELECTRICAL 16000-10
working hours until the project is complete and shall be authorized to act as the
Contractor's agent in the absence of said Contractor. This foreman shall not be
relieved of his duties on the project except by permission or by request of the
Engineer.
21. WARRANTIES
A. Provide warranties to the Owner that the materials and equipment furnished are
new, unless otherwise specified, and that all work is of good quality, free from
faults and defects and in conformance with the Contract Documents. Unless
otherwise specified, all warrants shall extend for a period of 12 months or greater
as noted below. However, latent defects in materials, equipment or workmanship
that are not discovered until sometime during the second year following
acceptance, shall remain the contractor’s responsibility to correct.
B. Warranties on all work and equipment shall commence on the date of substantial
completion of the work or designated portion thereof unless otherwise provided
in the Certificate of Substantial Completion. These warranties and all related
documents shall be presented in writing prior to the issuance of any Certificates.
Warranties shall include equipment manufacturer's written certificates warranting
the equipment furnished complies with all requirements of the drawings and
specifications. This documentation shall be submitted in an appropriately
marked, 3-ring hard cover binder.
C. If, within one year after the date of substantial completion of the work or within
one year after acceptance by the Owner or within such longer period of time as
noted above or as may be prescribed by the terms of any applicable special
warranty stipulated in the Contract Documents, any portion of the work is found
to be defective, functioning improperly, or not in accordance with the Contract
Documents, it shall be promptly corrected upon receipt of official notification to
do so. This obligation shall survive termination of the contract.
22. PAINTING
A. The following items of painting work shall be included in this Section:
1. Electrical equipment which has been factory finished but where the finish
has become marred or rusted, shall be sanded and refinished equal to the
original factory finish.
23. HOISTS, RIGGING, TRANSPORTATION AND SCAFFOLDING
A. Provide all necessary scaffolding, staging, cribbing, tackle, hoists and rigging to
locate the material, equipment, etc. of this section in its proper place on the
project. All such temporary work shall be removed from the premises when no
longer required.
B. Pay all costs related to the transportation of materials and equipment to the job
site. These costs shall be covered in the bid as no additional allowance will be
made by the Owner.
C. Scaffolding and hoisting equipment shall comply with requirements of all
pertinent Federal, State and Local Laws and Codes.