Specifications

SECURITY CAMERA SYSTEM UPGRADES AND REPLACEMENTS
FOR MONTGOMERY COUNTY DETENTION CENTER
ELECTRICAL 16000-9
4. First Section: A written description of system contents, where the system
is actually located in the building, how each part functions individually
and how the system works as a whole...Conclude with a list of the items
requiring service and either state the service and frequency needed or
refer to the manufacturer's data in the binder that describes the proper
service.
5. Second Section: A copy of each approved shop drawing, (clearly marked
to identify the item furnished) with an index at the beginning of the
section...Provide a separate list of all lighting fixtures and luminaires used
on the job. The list shall include but not be limited to fixture type,
manufacturer's catalog number and voltage, number of lamps, lamp type,
ballast catalog number, manufacturer's name and quantity when required,
catalog number and quantity of any replacement glass and/or plastic parts.
6. Third Section: A copy of each manufacturer's operating instructions with
an index at the beginning of the section.
7. Fourth Section: A list of all equipment used on the job, Contractor's
purchase order numbers, supplier's name and address.
D. Arrange for technical instruction of the Owner's maintenance personnel for such
time as would be reasonably required to acquaint them with their duties. In
addition, deliver to the Owner all special tools or equipment required for making
normal adjustments on any equipment or apparatus furnished under this contract
heading.
E. Technical instructions involving installed equipment shall include a demonstration
of the equipment and/or the operating system(s) with a description of the
operation explained to the owner's representatives. It shall be this Contractor's
responsibility to arrange this demonstration with the Owner as well as
representatives of suppliers. The demonstration shall take place after all testing
and balancing and written reports of such work have been submitted to and
accepted by the Architect/Engineer. The time when the satisfactory completion
of this technical instruction and demonstration takes place will establish the date
of final acceptance of the system and/or project unless otherwise stipulated.
19. EQUIPMENT CLEARANCES AND REQUIREMENTS
A. For items of equipment described in these drawings and specifications several
manufacturers are listed. The first named in each instance is the make on which
the layout was based and on which clearances, service requirements, and
electrical characteristics, etc. have been checked.
B. Due to the possibility of restrictions imposed by space limitations, the
responsibility for resolving conflicts resulting from the use of equipment other
than first named or of alternate equipment shall rest with the equipment supplier
and the Contractor. Submittals for this equipment will be considered as a
statement that clearances for access, service, maintenance, etc. have been checked
and found adequate.
20. CONTRACTORS' FOREMAN
A. With reference to the work under this section, a competent foreman shall be
assigned to the project. The foreman shall remain on the job during all normal