Specifications

SECURITY CAMERA SYSTEM UPGRADES AND REPLACEMENTS
FOR MONTGOMERY COUNTY DETENTION CENTER
ELECTRICAL 16000-5
2. Protect equipment and finished surfaces.
3. Protect all electrical equipment.
4. Exercise extreme caution in the handling and storage of tools, material
and equipment.
11. PREPARATION OF BIDS
A. All bids shall be based upon furnishing and installing the make of materials and
apparatus specified herein WITHOUT SUBSTITUTION, in order that all bids
may be properly compared.
12. SHOP DRAWINGS
A. Prepare or obtain from the manufacturer, certified shop or erection drawings of
all items of equipment to be furnished under this section and submit copies of
same as required for review. This shall be done as soon as possible, well prior
to proceeding with installation or construction and in the proper sequence to
avoid delays in the work, the work of the Owner or other contractors. Unless
otherwise indicated, a minimum of six (6) sets shall be submitted. These
drawings shall be complete in every respect, showing pertinent details regarding
size, external and internal features, mechanical and/or electrical arrangements,
locations of connections, installation and mounting instructions, materials, gauges,
electrical characteristics, wiring diagrams, and other information necessary to
show compliance with the intent of the contract documents. Note that in the
following items of this specification, where more than one equipment
manufacturer is listed, the first named has been used as the basis for design. All
departures or deviations in performance, service requirements, size, etc. from first
named by the make submitted shall be noted on the shop drawings. Where
departures or deviations do occur, the contractor shall additionally itemize same
on the cover sheet that accompanies the submittals. Failure to do so will risk
subsequent rejection at the job site. (With regard to voluntary substitutions, refer
also to Item BIDDING in this specification and item EQUIPMENT
CLEARANCES AND REQUIREMENTS.
B. By submitting such drawings, the Contractor represents that he has selected and
verified the materials and equipment, taken necessary field measurements, noted
field construction criteria, etc., related thereto, or will do so, and has checked and
coordinated the information contained within such submittals with the
requirements of the Work and the Contract Documents.
C. Materials and equipment to be furnished for this project shall be of current
production by manufacturers regularly engaged in the manufacture of such items.
When two or more similar units are required, they shall be the product of one
manufacturer.
D. The review of shop drawings shall not be construed as a complete check but will
indicate only that the capacity, general method of construction and/or detailing
is satisfactory. Carefully check and verify dimensions for installation and service
requirements before ordering equipment for the project.