Specifications
SECURITY CAMERA SYSTEM UPGRADES AND REPLACEMENTS
FOR MONTGOMERY COUNTY DETENTION CENTER
ELECTRICAL 16000-2
C. At completion of the project furnish to the Owner, at no additional charge, a
certificate(s) of inspection issued by the authorized agency (or agencies) having
jurisdiction over this portion of the project, stating that all work executed under
this section complies with the minimum requirements.
D. Additional fees, charges, etc. imposed by other contractors and/or tradesmen,
professional consultants, etc. for services rendered in connection with performing
any portion of the work under this section shall be included as part of the work.
This shall include surveys, profiles and/or other miscellaneous drawings, etc. that
may be required in addition to the contract documents by any governing
authority.
5. SITE INVESTIGATION
A. Prior to bidding, it is recommended that the contractor visit the job site and
investigate all details which may have any effect on the installation, progress or
completion of the project.
B. When a bid is received, it will be assumed that the contractor has made the job
site visit(s) and is familiar with the conditions as they exist and any adjustments
and/or modifications that may be necessary in order to perform and complete the
work as specified.
C. At project start-up, certain areas will be designated for the storage of materials
and equipment and cooperation with the Owner in minimizing interference with
existing operations will be mandatory.
6. DRAWINGS
A. The drawings prepared for this project are an outline to show where conduit,
devices and equipment must go in order to harmonize with the building. All
work must be installed in accordance with the drawings insofar as possible. All
drawings shall be carefully checked during the course of bidding and
construction. If any discrepancies, errors or omissions are discovered prior to or
during the construction phase, notify the Engineer immediately for interpretation
or correction. Note that an overlap with another trade does not relieve the
contractor from the obligation of performing the work indicated on the drawings
for this section of the project unless written notification stating such is obtained
from the Engineer.
B. Take all necessary measurements and be responsible for same, including
clearances for all equipment that is to be furnished. The Engineer shall reserve
the right to make minor location changes of equipment where such adjustments
are deemed desirable from an appearance, installation or operational standpoint.
Such changes will normally be initiated sufficiently in advance to avoid extra
work or unduly delay progress on the project.
C. In general, the conduit and wiring layouts shall be considered as diagrammatic
for clearness and legibility and are to be used as a guide. Therefore, it is not
intended that the drawings indicate all necessary offsets, junction boxes, pull
boxes, etc. Conduit, wiring, fixtures, devices, equipment, etc. may have to be
offset, lowered or raised as required or as directed at the site in order to
accommodate field conditions. In addition, relocate or shift equipment, fixtures
and devices without cost, when so directed by the Engineer, providing such items