Specifications

SECURITY CAMERA SYSTEM UPGRADES AND REPLACEMENTS
FOR MONTGOMERY COUNTY DETENTION CENTER
ELECTRICAL 16000-1
ELECTRICAL
SECTION 16000
1. NOTE
A. The Drawings and General Conditions of the Contract as well as Division 1 -
General Specifications apply in the work covered under this section.
2. SCOPE
A. The work included under this section shall consist of the furnishing of all labor,
materials, equipment and incidentals necessary to perform the electrical and
related work indicated on the drawings and as called out in the following
technical specifications. This shall include all testing and adjustments required
and/or specified.
3. DESCRIPTION OF WORK
A. The following is a summary of the principal categories of work under this
section. Note, however, that this listing is for general information only and work
will not necessarily be limited to these categories. The detailed drawings and the
following specifications cover the full extent of the work.
B. Surveillance System:
1. Additions and/or revisions to the existing Jail Surveillance system as
indicated on the drawings.
C. Demolition:
1. Demolition and salvage of existing devices, systems, fixtures, etc.
2. Removal of existing electrical devices that are noted on drawings and
those devices in the area of the remodeling that are obviously necessary
to be removed.
4. PERMITS, FEES, INSPECTIONS, LAWS & REGULATIONS
A. Obtain and pay for all permits required in connection with this section of the
work. In addition, pay all necessary inspection fees or similar charges. Laws
and regulations which bear upon or affect this work shall be complied with and
are hereby made a part of this section of the work. All work which such laws
require to be inspected shall be submitted to the proper public officials for
inspection.
B. The requirements of the National Electrical Code (NEC), NFPA, as well as all
local ordinances and regulations, including those of the local utility company,
shall be followed and adhered to with regard to the work under this section.
Where the contract documents (plans, specifications, etc.) exceed the minimum
requirements of the NEC and/or other regulations, etc., the document
requirements shall govern.