Owner`s manual

SYSTEM INSTALLATION AND SERVICE
AT AND 3T STEAMERS
4211-103 10-10-11
Page 7
DIAGRAM 8: LOCATING THE STEAM HEADS
3/8" from wall
Fragrance
Reservoir
1-3/8" Diameter hole
1/2" NPT Fitting
Center in opening
1/2" NPT
Sweat Adapter
SPACER
STUD
Add silicone all around
the back of the insulator
before mounting.
DIAGRAM 7: INSTALLING THE STEAM HEADS
Steam Head
Steam Head Insulator
DIAGRAM 9: SEALING THE STEAM HEAD
6”
Min
6” Min
6” Min
6”
Min
6”
Min
12”
Min
12”
Min
18”
Min
18”
Min
DIAGRAM 10: SOME TYPICAL DRAIN LINES
SECTION 4: PLUMBING THE GENERATORS (continued)
6. INSTALL THE PRESSURE RELIEF VALVE
Install the pressure relief valve into its port on the generator. Run a 3/4” copper pipe from the valve to an appropriate
drain. Do not connect the valve to the generator’s drain line! Install the valve according to local and national codes.