Installation Guide

AmDry Installation Guide
Basement Preparation:
Sweep and / or vacuum all loose debris off
basement floor
Check to make sure the floor is level and any
major holes or uneven areas greater than ¼” over
a 36” to 48” area be repaired using a self-leveling
concrete product. The AmDry panel will
accommodate minor irregularities and uneven
spots in the basement floor.
2