Installation Guide

AmDry Installation Guide
2
Basement Preparation:
Place panels in the basement for a minimum of 24
hours prior to installation to acclimatize to the room,
lay the panels flat to the floor
Sweep and / or vacuum all loose debris off basement
floor
Check to make sure the floor is level and any major
holes or uneven areas greater than ¼” over a 36” to
48” area be repaired using a self-leveling concrete
product. The AmDry panel will accommodate minor
irregularities and uneven spots in the basement floor.