Computer Accessories User Manual
Table Of Contents
- Title Page
- Table of Contents
- About this User Guide
- Getting Started with Your 3ware RAID Controller
- Introducing the 3ware® 9590SE-4ME RAID Controller
- 3DM 2 (3ware Disk Manager) Introduction
- Configuring Your Controller
- Configuring Units
- Maintaining Units
- Checking Unit and Drive Status
- About Degraded Units
- About Inoperable Units
- Alarms, Errors, and Other Events
- Background Tasks
- Scheduling Background Tasks
- Locating a Drive by Blinking Its LED
- Maintaining Your Controller
- 3DM 2 Reference
- Troubleshooting
- Appendices
- Index

Scheduling Background Tasks
www.3ware.com 79
3 In the Schedule Rebuild Tasks section, select the appropriate setting:
Follow Schedule or Ignore Schedule.
The illustration below shows this setting for the rebuild task schedule.
Removing a Task Schedule
By default, daily task schedules are defined, each starting at 12:00 am and
running for 24 hours.
A maximum of seven schedules can be defined. When seven schedules are
shown for any of the tasks, you must remove a schedule before you can add
another.
To remove a task schedule
1 Choose
Management > Schedule from the menu bar.
The Scheduling page appears, showing the schedule for Rebuild/Migrate
Tasks.
2 To view Verify Tasks or Self-test Tasks, select it from the drop-down list
at the top of the page.
3 Select the checkbox next to the schedule(s) you want to remove.
4 Click the
Remove Checked button.
The page refreshes, and the selected schedule(s) are removed. You can
now add another schedule.
Adding a New Task Schedule Slot
When you add a rebuild/migrate or verify task schedule, you specify the day
of the week, time, and duration for the task. For self-test schedules, you
specify day and time, but not duration. (Duration is not required for self-tests.)
Depending on the schedule and system workload, background tasks may
require more than one scheduled duration to complete.
Note: Self-test schedules cannot be turned off in this way. To disable self-tests you
must either remove all schedule times, or uncheck the tests listed in the
Tasks
column. For more information, see “Selecting Self-tests to be Performed” on
page 80
.










