Computer Accessories User Manual
Table Of Contents
- Title Page
- Table of Contents
- About this User Guide
- Getting Started with Your 3ware RAID Controller
- Introducing the 3ware® 9590SE-4ME RAID Controller
- 3DM 2 (3ware Disk Manager) Introduction
- Configuring Your Controller
- Configuring Units
- Maintaining Units
- Checking Unit and Drive Status
- About Degraded Units
- About Inoperable Units
- Alarms, Errors, and Other Events
- Background Tasks
- Scheduling Background Tasks
- Locating a Drive by Blinking Its LED
- Maintaining Your Controller
- 3DM 2 Reference
- Troubleshooting
- Appendices
- Index

Scheduling page
www.3ware.com 97
Scheduling page
Figure 38. Scheduling Page
The Scheduling page appears when you choose Management > Scheduling
from the menu bar.
The Scheduling page lets you set up a schedule for when background tasks
(rebuild, migrate, initialize, verify, and self-test) should occur. Background
tasks can have impact on the performance of your system, so you may prefer
to schedule them at times when they will be least disruptive, such as in the
middle of the night or on a weekend.
Select a type of task you would like to schedule. You start by selecting the
type of task for which you want to set the schedule from the drop-down list at
the top of the page.
• Rebuild/migrate tasks (also applies to initialization)
• Verify tasks (also applies to media scans)
• Self-tests
3DM then updates the page to show you schedule details for that type of task.