Installation Guide
2 of 3 
      Step 5 
                         Remove the cover plate and slide it to the back of 
                         the wire cover tube. Now place the unit over the 
                         tapered bushings installed in Step 4. 
                         Securely hand-tighten each of the four set screws on 
                         the bottom of the tubes. 
                         Remove wire from slot in the end of the horizontal 
                         tube. Position the wire from the rail and the wire from 
                         the junction box to allow for connection. (Fig 5) 
                         Splice the wires using the connectors provided and 
                         place them inside the junction box. Cover the box 
                         with the plate and secure with screws provided. 
Step 6 
The towel rails must be connected to either  
an on/off switch (like a light switch) or a 
7 day/24 hour programmable timer. (Fig 6) 
Make sure one is provided for at installation. 
The towel warmer will not perform if a timer 
with a shorter cycle is used. 
See wiring diagram below: 
Please note: Due to the low 
power requirements, and 
the built-in thermostat which 
maintains the unit at a safe 
temperature, these units 
can be left on all the time 
without much energy 
consumption. The longer the 
unit is on the more 
effectively it will perform. 
Fi
g
 6 
Fi
g
 5 



