Installation and Operation Guide

2-6 TS-3000i Web Clock Installation & Operation Guide
Step 10. With the FPR battery pack in the holder alongside the network
RJ-45 connector, plug in the FPR battery cable (the connector
with the black and red wires) into the open brown connector
(see Figure 2-8) located just under the battery pack on the
PCB at CN4.
Figure 2-8: Rear View Showing Cable/Connector Location
NoteFor units with the FPR option, disconnect the FPR
battery pack cable connector if the TS-3000i clock will not be
plugged into AC power for an extended amount of time. Leaving
the battery pack connected without charging for a long time
could promote battery harm and damage to the clock.