Ventless Submittal Information

225 49
th
Ave. Dr. SW, Cedar Rapids, IA 52404
800-233-2366, 319-368-8120, Fax: 319-368-8198
www.acpsolutions.com
ARX1 / MRX1 Estimated Heat Load Calculations
ARX1/MRX1 (single phase)
Parameters
Operating Time 12 Hours
Energy Costs $0.11 KWHr
Idle Time 2 Hours
Cook Cycles/Daily 100
Typical Cook Time 60 Seconds
Data
Time
(Minutes)
Power
(Watts)
kWh Cost/Day
Balance of
Time
(Hours)
Warm Up
9
2,990
0.4
$0.05
11.85
Cooking
100
3,223
5.4
$0.59
10.15
Idle Time
611
927
9.4
$1.04
0.00
TOTAL COST PER DAY
$1.68
TOTAL COST PER MONTH
$50.36
TOTAL COST PER YEAR
$604.30
HVAC Requirements per Operating Time (Estimated)
Average
Energy
Cooking
and Idle
Warm-Up
Energy
Total
Energy
Total
Average
Power
Total
Environmental
Load
Average
Cooling
Requirement
53,322 kJ 1,615 kJ 54,936 kJ 1,272 W 4,339 Btu/hr
0.36 Tons of
AC